Pages
Custom Search
JOB VACANCY IN BALIKPAPAN
Monday, February 23, 2015
Sunday, February 22, 2015
CORROSION INHIBITOR SKID WELLHEAD PLATFORM
A general term for injection processes that use special chemical solutions to improve oil recovery, remove formation damage, clean blocked perforations or formation layers, reduce or inhibit corrosion, upgrade crude oil, or address crude oil flow-assurance issues. Injection can be administered continuously, in batches, in injection wells, or at times in production wells.
Saturday, February 21, 2015
AutoCAD Tool Palettes – Cable Tray, Tubing Tray and fitting included attribute for 3d models
![]() |
| STRAIGHT CABLE TRAY USE AUTO LISP |
![]() |
| SAMPLE ASSEMBLING WITH FITTING TRAYS |
Adding and
editing components becomes easier in AutoCAD with tool palettes. The tool
palettes contain blocks. With the parameter action Polar Stretch, you can just
type the length you desire and AutoCAD will stretch the tray to that length.
Furthermore, you can rotate the block before you place it. In my opinion the
tool palettes are user friendly. Even a novice can use them. Moreover you can
insert blocks into your drawing with drag and drop. It is easy to access from
tool palettes.
Open and close
the tool palette by pressing CTRL+3. You can auto-hide the tool palette in the
vertical blue area of the tool palette, simply click on the symbol <>I.
By doing that, you leave more space in the drawing area.
Friday, February 20, 2015
ITEM SAFETY INSPECTION CHECK FOR WELDING MACHINE :
- Spark arrestor
- Insulation system of exhaust
- Electrical/ welding cable connection
- ESD. system
- Socket/ Power supply connector
- Electric cable insulation
- Cable grounding system
- Ampere indicator
- Safety guarding system
- ELCB (30 mA) installed
- Battery covered
- Engine and fuel system leaks
- Lifting point/ pad eye condition (certified)
- Fire extinguisher ( stand by when use)
- General condition
- Inspection sticker
ITEM SAFETY INSPECTION CHECK FOR SCAFFOLDING:
GUARD RAILS
Securely fastened, 90 cm to 120 cm high, Gap between toe board and first
rail not more or <76 cm="" o:p="">
TOE BOARDS
All rounds protection against objects falling, Minimum high 15 cm.
Monday, February 16, 2015
Wednesday, February 11, 2015
Wednesday, February 4, 2015
Subscribe to:
Comments (Atom)









