GUARD RAILS
Securely fastened, 90 cm to 120 cm high, Gap between toe board and first
rail not more or <76 cm="" o:p="">76>
TOE BOARDS
All rounds protection against objects falling, Minimum high 15 cm.
DECKING/ BOARDS
Close boarded to prevent toes / nuts dropping through, Tied down against
wind, Not split or cracked, Free from knots, Minimum thickness 3cm wood.
TUBULARS/ PIPES
No distortion, No
cuts or holes, No bents or flattening
SUPPORTS
Upright position, Distance
each supports
- Max. 2.4 m (man working).
- Max. 1.2 m (load bearing)
FOUNDATIONS
Prepared & level
foundation, Sole plates, covering two supports on soft grounding.
ACCESS LADDER
Set at 750 approx (1
in 4 ), Additional horizontal pipe if no ladder available. Is the proper access
for ladders? Are ladders secure at least at the top? Are scaffolds constructed
by competent personnel? For process sites are no light alloy or aluminium
ladders used on site? Scaffolder Inspector certified? Scaffolder certified?
LANDING
Ladder at least 1 m
(± 5 rungs) above landing place. Ladder lashed to stiles not rungs
TRANSOMES AS DECKING
SUPPORTS
Each board must rest
on at least 3 supports. Decking board ends not to extend over support more than
15 cm.
OTHERS
Are safety harnesses used when required? Are scaffold inspections performed after each
modification & at least weekly? Are proper records kept? Are proper
scaffold entry tag used to inform personnel when it is
No comments:
Post a Comment