R.Land Baidin Egwar, ST

Pages

▼
Thursday, March 12, 2015

Difference Process shutdown (PSD) and Emergency Shutdown (ESD)

›
ESDV ACTUATOR PSDV ACTUATOR PSD is defined as the automatic isolation and the activation of all part of a process. During a PS...
Monday, March 9, 2015

ITEMS SAFETY INSPECTION CHECK FOR GAS TESTING

›
Are personnel trained in the use of gas detector equipment?  Is there a master list on site of the certified authorized gas testers?...

ITEMS SAFETY INSPECTION CHECK FOR IONIZING RADIATION

›
 Are radioactive isotopes used on site? If so are personnel aware of the dangers?  Are all the required personnel carrying dosimeters?...

ITEMS SAFETY INSPECTION CHECK FOR WORKSHOP

›
Is the workshop outside a hazardous area? Does the electrical installations look satisfactory? Are there any temporary electrical in...
Monday, February 23, 2015

PIPING & INSTRUMENTATION DIAGRAM SYMBOLS

›
PAGE 1 OF 6
›
Home
View web version
Powered by Blogger.