Offshore staff
LONDON, UK -- TOTAL E&P Indonesie has awarded AMEC Berca Indonesia, a joint venture of AMEC and CCM Group based in Jakarta, design contracts for Tunu Phase 11. Tunu is a gas and condensate field in the Mahakam river delta, East Kalimantan, Indonesia.
The contracts involve the design of offsite piping, telecommunications cable, and tie-in work for the north and south parts of the field.
As design contractor, ABI will be responsible for detailed engineering work, including pre-engineering, survey, detailed engineering, and final documentation. The engineering phase for both projects will be completed in June 2008.
"We are delighted to continue our relationship with Total, one of our primary customers in Indonesia," says Ben Dowson, ABI general manager. "The awards follow contracts awarded to us in January by Punj Lloyd Indonesia for detailed design services for the Tunu Phase 11 South utility platform, which forms part of the same development."
No comments:
Post a Comment